![](http://www.kixinlife.com/blog/2013/07_broom01.jpg)
We start by peeling off the vinyl:
![](http://www.kixinlife.com/blog/2013/07_broom02.jpg)
![](http://www.kixinlife.com/blog/2013/07_broom03.jpg)
Then we need to remove the paper backing. What a long messy process that was:
![](http://www.kixinlife.com/blog/2013/07_broom04.jpg)
We had 3 walls to strip. We have vaulted ceilings in the bedroom and at least we finished the tall wall and half of the slanted wall, in 4 hours.
![](http://www.kixinlife.com/blog/2013/07_broom05.jpg)
Chris is a BIG help! WOWee that guy worked hard today, and that was after we did a 10.5 mile bike ride. I treated him to a Hawaiian salmon dinner afterwards. The last full wall has a sliding glass door in it, so I'm hoping it will go fast:
![](http://www.kixinlife.com/blog/2013/07_broom06.jpg)
WOW!!! That is such a pain in the butt job. Looks like you are really making progress though. I can't wait to see the end product.
ReplyDelete